Two men in safety gear standing near a large industrial vapor tank outdoors.

2007 1

Vapor Point Inception

A group of guys got together and invented a novel way of interacting vapor with a liquid bath – Vapor Point scrubbing systems was born.

Industrial filtration system with multiple tanks and pipes outdoors.

2009 2

TCEQ Recognizes Scrubbers as Control Device

The TCEQ initiated a test with a third-party verification company to test Vapor Point efficiency with regards to MSS. Vapor Point proved the efficiency - opening the door for scrubbers to be used as a control device as recognized by the TCEQ.


BWON Controls Installed

Vapor Point installs BWON controls - saving millions in carbon controls.


High Flow Scrubbers Introduced

Vapor Point introduces the first High Flow Scrubber to the industry - capable of 6,000 cfm.

Industrial vacuum pump system with multiple connected components.

2011 3

First Patents Received

US Patent office issues Vapor Points first set of patents.

Industrial workers maintain large white tanks under a clear blue sky.

2012 4

Replaced TOX Unit

Vapor Point replaces a TOX unit with scrubbers monitored by a CEMS unit with zero breakthrough.

Large industrial filtration unit with multiple hoses connected.

2013 5

Achieved New Record for Hâ‚‚S Level Controlled

Vapor Point controls 12% Hâ‚‚S from a process, reducing SOx emissions to atmosphere.

Fuel storage tanks at an outdoor industrial site under a clear sky.

2015 6

Crude Tanks Degassing and Controls Reach New Heights

First crude tank controlled and degassed utilizing only scrubber technology.


Pioneered Flareless Chemical Cleaning

Vapor Point executes the first flareless chemical cleaning in the industry.


Launched Off-Spec Fuels Program

Off -spec fuels program launched to improve process efficiency with core clients around the nation.

Industrial site with machinery and piping under a clear sky.

2015 7

Flare Sweetening Systems Born

Vapor Point is the first to introduce flare sweetening utilizing scrubber systems and hot tap into flare line.

Industrial equipment mounted on a flatbed trailer outdoors.

2017 8

Chemical Plant Turnaround Work Begins

Ethylene turnaround solids management program was introduced to eliminate Hâ‚‚S / SO2 and inventory solids directly into final waste container for disposal without further handling.

Water Program Added to Service Line

Water division processes high emulsion laden stream for off-site disposal.

Five workers in blue uniforms and helmets pose in front of a large industrial machine outdoors.

2019 9

Achieves Milestone for Flareless Turnaround Work

Vapor Point Reaches 500th flareless turnaround.

White industrial tanks and equipment under a clear sky.

2022 10

Thermal Division Launched

Vapor Point launches the Thermal Group with the addition of Paul Anderson.